Storage tanks in Boronów and Rejowiec
Tank capacity:
2 tanks of 32 thousand m3 and 1 tank 10,000 m3 m3
Completion date:
56 weeks
On December 4, 2019, the consortium of Mostostal Płock and Mostostal Warszawa and PERN signed a contract for the construction of tanks at the Fuel Depots in Boronów and Rejowiec.
The task that Mostostal Płock will perform as part of a consortium with Mostostal Warszawa includes construction of a storage tank with a capacity of 10,000 m3 m3 at the Fuel Depot in Boronów and two storage tanks with a capacity of 32 thousand. m3 at the Fuel Depot in Rejowiec.
Contract details
General Contractor: Consortium composed of Mostostal Warszawa (leader), Mostostal Płock (partner)
Completion date: 56 weeks from the date of signing the contract
The maximum warranty period is 60 months.